Overview
A direct-fit replacement, the Full Force Reman 140cc AD/AE Stock Replacement Fuel Injector Set delivers the factory 140cc of fuel to your 1999.5-2003 Ford 7.3L Powerstroke. Each injector is remanufactured from quality components, and provides you with long-term reliable performance.
Features
- Direct-Fit AD/AE Fuel Injector Set
- Stock Fuel Flow Rating
- Remanufactured With Quality Components
Warranty
18 Month / Unlimited Mileage